Hotels

The following are examples of projects we have recently completed

The University Arms Hotel

The University Arms Hotel

Cambridge

RBC were appointed to provide full Building Control Services for the new £80million UNIVERSITY ARMS CAMBRIDGE. The redesign, rebuilding and refurbishment has increased the hotel’s capacity of both guestrooms and public spaces within the original footprint, whilst preserving the historic elements of the original building. RBC have been instrumental in ensuring the increased capacity meets all public and operational constraints whilst returning this beautiful hotel to its previous stature.


The Langham Hotel

The Langham Hotel

London

RBC have been working with Method Architects, Richard International and Reardon Smith Architects on the redevelopment of this stunning hotel in London providing full building control services. Some of the projects include: adaptations of existing hotel spa and fitness suite to new bar and fitness suite with associated WCs, kitchen and ancillary accommodation; suite refurbishment over 6 floors of the existing hotel; provision of new 3 bedroom luxury suite, provision of new club lounge, replacement of main hotel boilers, soft refurbishment of 47 bedrooms plus provision of one new suite.


The Lancaster London Hotel

The Lancaster London Hotel

London

RBC are providing full building control services for the redevelopment and refurbishment of this iconic building. We have been working with the The Lancaster London Hotel, GB Fitzsimon LLP, Ashleigh House Developments and DW Pointer (Fire Consultants) and some of the projects include: demolition of Circular Canopy, Atrium and internal staircase, extension of lobby area, atrium, plantroom above and infill of existing rampt to form a baggage store and new staircase; refurbishment of all bedrooms, corridors and staircase, including new AHUs, condensers and boiler installations; refurbishment of Westbourne Suite; development of prototype bedroom and the replacement of capital plant.

A selection of current and complete projects in the Hotel sector

PROJECTDESCRIPTIONCLIENT
The Holiday Inn
London
Refurbishment to 405 bedrooms and bathrooms over eight floors of this hotel Connor Construction
Bodelwyddan Castle Hotel
North Wales
Construction of 45 garden rooms, atrium extension, alterations to existing building and associated landscaping PWP Architects
Gunston Hall
Suffolk
Demolition of existing chalets and construction of new build lodge accommodation and associated landscaping PWP Architects
The Grange Beauchamp Hotel
London
Conversion of 4 listed town houses to form a hotel. RBC assisted with means of escape, fire and sound insulation improvements, along with thermal upgrading including ‘consequential improvements’ as a result of the conversion Globalrange Ltd
South Lodge Hotel
West Sussex
Refurbishment of six bedrooms and bathrooms Connor Construction
Dormy House Hotel
Gloucester
Refurbishment of bedrooms and bathrooms with the installation of new air conditioning system BM Trevillion Interiors
Farnhams Hall Hotel
Hertfordshire
Refurbishment of thirteen bedrooms Connor Construction
Royal Berkshire Hotel
Ascot
Refurbishment of fourteen bedrooms and bathrooms Connor Construction
RICSConstruction Industry CouncilACAI9001 14001 18001Reg ColCHAS logo

Joomla website carefully crafted by Green Parrot Joomla Web Design