Stepping Hill Hospital, Stockport

Taylor Young

Stepping Hill Hospital, Stockport

The project comprises a three-storey extension to the CSU building which forms part of the hospital complex at Stepping Hill, Stockport.

The building is constructed using a prefabricated modular system which is factory produced and delivered to site and then craned into position.

The units are steel framed structure with an infill panel of timber framing and lining systems.  The units are pre-finished internally with electrical conduit and hidden plumbing fixtures factory fitted.  The units are positioned and connected together forming the building extension as a whole, ready for cable feeds and ductwork to be fitted.

Whilst internal work is in progress work is able to commence on the external cladding which is mainly standard facework and window systems.

The project has been designed to reduce construction time between casting the first foundation and touching up the paintwork.

Get in touch

Head Office - Waltham Abbey

01992 653900

This email address is being protected from spambots. You need JavaScript enabled to view it.

Hampshire

02392 499486

This email address is being protected from spambots. You need JavaScript enabled to view it.

London

0207 383 5764

This email address is being protected from spambots. You need JavaScript enabled to view it.

Manchester

0161 486 3309

This email address is being protected from spambots. You need JavaScript enabled to view it.

Berkshire

01635 231 437

This email address is being protected from spambots. You need JavaScript enabled to view it.